Vape Cartridge capacity without surprises
We ship vape cartridges to distributors, chain buyers and independent shops. What follows is the material we normally cover in a first conversation: what we hold in stock, how we test it, how it ships, and what happens when a carton arrives damaged.
Published 22 July 2025 · VapeWholesaleHub · Reading time 5 min
Keeping the second shipment identical
We work with B2B buyers who order between a few hundred and a few thousand units at a time, and we treat both ends the same way: a written specification, a sample you approve, and a production run that matches the sample.
Every account gets a named contact who has actually seen the product. Being passed between three people to answer one question about a coil resistance is the fastest way to lose a buyer, so we do not organise support that way.
We keep the specification sheet for every order on file. Two years later, when a customer asks whether a pod is compatible, the answer is a lookup rather than a guess.
Where defects actually come from
We photograph the packing station during production for volume orders. It is a small thing, but it settles most arguments about what was actually in the carton before it was sealed.
Battery safety is not a marketing line. Cells are matched by capacity and internal resistance before assembly, charging boards are checked for cut-off voltage, and any unit that fails the cut-off test never reaches packing.
Shipping without surprises
If you dropship, we can label cartons to your format and omit our documentation from the outer box. It is a small operational detail that decides whether your customer sees a supplier or a partner.
We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 15 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.
- Artwork proof plus physical dummy for custom packaging
- Mixed SKU cartons to spread first-order risk
- Seven-day defect reporting with replace-or-credit
- Batch codes traceable from carton back to production date
- Standing reorder schedule with a fixed cut-off
- Cartons drop-tested and pallet-counted for clean freight
Compliance without the last-minute scramble
If you sell into a market that requires child-resistant packaging, say so at quotation stage. Retrofitting a CR closure onto a finished bottle design usually means a new mould and a four week delay.
Artwork approval is a two stage process: a digital proof for text and layout, then a physical dummy for colour and finish. Skipping the dummy is the single most common cause of a reprint.
Specification summary
| Volume | 2.0 ml |
| Core | Cotton |
| Resistance | 1.2 ohm |
| Thread | Press-fit |
| Airflow | Side |
| Packaging | Tube |
| Minimum order | 100 units per SKU, mixed cartons allowed |
| Lead time | 25 working days after artwork approval |
The detail above is what we hold ourselves to on every shipment, including the small ones. It is also the list we will walk through with you before the first order.
Frequently asked
How long does production take?
Around 15 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
What happens if part of the order is defective?
Report within seven days with photos and the batch code. Confirmed defects are replaced or credited on the next shipment. The failure is logged by mode and batch, and reviewed monthly with the factory.
Can you ship to multiple locations?
Yes. Split shipments are quoted separately because consolidation and splitting price differently. Tell us the destination list at quotation stage and we will show both options.
Related reading
Need a quotation on vape cartridges?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz